ISWUK & 8build Specify AliDeck Senior Board & Balcony Drainage System

AliDeck has recently partnered with ISWUK and 8build to undertake a significant terrace decking project at 3 Sheldon Square, Paddington, London. This collaboration will showcase the innovative application of the AliDeck Senior board and Balcony Drainage System across multiple floors of the terrace deck, which overlooks a high-profile urban setting.
 
The project aimed not only to enhance the visual appeal of the terrace areas but also demonstrates the versatility and efficiency of AliDeck’s products in addressing complex architectural challenges.

3 Sheldon Square, located in the heart of Paddington, London, is a prime example of modern urban development, combining retail, office, and now leisure space. The need for a durable, aesthetically pleasing, and fire-resistant decking solution was paramount, given the project’s scale and its significance to the local environment.

You may recall a previous post on our website in which we previewed this project and this new partnership in September 2023. AliDeck promised to deliver unparalleled quality and innovation, and Daniel from ISWUK was extremely pleased with the results and the support he received from AliDeck Sales Manager, Louis Taylor.

“We firstly want to thank Louis for putting ISWUK in contact with 8build for this project, it has been a pleasure to be a part of it. Louis was extremely helpful throughout the process, from the specification of products all the way through to final clean-up for those all-important images! He was very reactive to any of our needs, understood the time constraints the project was under and delivered where it mattered most. He was instrumental to the success of the project, and we will definitely work together again.”

- Daniel Paine, Managing Director at ISWUK

Close Collaboration Between All Parties the Key to Success with AliDeck

The primary objective of the Sheldon Square decking project was to provide a safe, cost-effective, and futureproof outdoor space for residents and visitors. To ensure safety standards were met, an efficient water management system was implemented for controlled evacuation of rainwater and spillage.

Our Ridged Board designs offer superior slip-resistance, a feature that becomes particularly beneficial for terrace deck projects where heavy footfall is expected, and minimal protection from the elements.
 
The need to bridge large spans between the lattice steel structures as per the architect’s design was no issue with our innovative solutions. Our Senior Decking Board spans a whopping 1200mm between supports on a 2kN point load to comply with BS 8579:2020. The use of our Supa Joists also supports these requirements, offering up to 3.5 metres between pedestals with an L/360 allowable deflection, based on a 1.4kN loading.

The 30mm Senior Ridged Board in RAL 7039 was selected for its durability and complemented by our Drainage Channels and Access Gutter for effective water management. This system was designed to meet the project’s specific needs while ensuring ease of installation and long-term performance. Jumbo Pedestal Brackets complete the system in order to create a robust subframe.

All AliDeck projects benefit from our in-house powder coating process, etching to 2 grams per square meter for unmatched adhesion and delamination resistance. We exclusively use Class-2 powders, ensuring superior chip resistance and longevity. This meticulous approach guarantees our decking solutions are not only visually stunning but built for durability and long-term performance, embodying our commitment to excellence in every project.
 
AliDeck’s aluminium decking boards, paired with our Nosing Profile, offer an elegant solution for integrating staircases into decking areas. This combination ensures a cohesive aesthetic while enhancing safety. The Nosing Profile, tailored for step edges, guarantees a smooth transition between levels.

Designed for simplicity and durability, these components create staircases that complement the terrace deck flawlessly, ensuring functionality and visual appeal. This seamless integration helps to elevate the project with safety of the users in mind.

Overcoming Architectural Challenges across 3 Sheldon Square

One of the key challenges faced during the project was addressing the site’s unique architectural constraints. The need to bridge large spans between proposed lake steel structures required a creative approach to subframe construction. AliDeck’s engineering team worked closely with ISWUK and 8build to develop custom solutions that would ensure the stability and integrity of the decking system.

The project also presented an opportunity to demonstrate AliDeck’s commitment to sustainability and innovation. By employing aluminium, a 100% recyclable material, the project aligned with broader environmental goals, showcasing a sustainable approach to modern construction challenges.
 
Would you like more information about this exciting new-build project in Sheldon Square, London?

If you would like to discuss further how we can best support and help you achieve compliant and fire-safe balconies, terraces, or walkways for an upcoming project, We’d love to talk to you. Simply contact us via 01622 534 050 or email info@alideck.co.uk.

Find out more about AliDeck & Milwood Group on their member profile page here

Member-created content 3 months ago | From members

More News

Share this page: