Harton POD

Manufactured by Dutypoint Ltd

Product Buying Options

Product Description

The Harton POD by Dutypoint is a prefabricated, fully sealed, below-ground cold-water storage tank and booster set plant room made from durable GRP. The Harton POD is a compact and cost-effective solution for plant room space. Dutypoint has built on the Harton legacy product design by introducing additional features and re-sourcing key components to deliver a more robust and easily maintained system.

The complete system is made of WRAS-approved components.

FULLY SEALED UNIT

Combining a single-piece GRP casing and a neoprene-sealed, lockable access hatch provides a durable and strong barrier from water entering the system. The installation process can be carried out without entering the POD, designed to allow external connection by the installation contractor.


PLUG AND PLAY

The plant room leakage detection system, sump pump and ventilation systems are automatically activated once the power supply is connected to the supplied cable tail. This protects immediately from condensation and unlikely leakage or water entry. The booster set and associated plant require an engineer commissioning visit after installation.

REMOTE MONITORING SYSTEM

A remote mimic alarm panel is included, which will visually indicate the system's status whilst removing the need to enter the pod. This panel also contains a GSM alarm system which enables any alerts via text or email to be transmitted to selected contacts.

HIGH-QUALITY VR BOOSTER SET

The POD is equipped with our VR variable-speed booster set system, which offers leading quality and dependability.  The Harton POD also delivers premium features such as HiRISE technology, TrueStandby™, QuikSWAP™, and burst pipe protection. Optional upgrade packs are also available to ensure fire standards for combined domestic water and sprinkler applications compliance.


FAILSAFE MAINS INLET CONTROL

The control system includes a failsafe mains inlet valve linked to various leakage detection devices. This inlet valve closes at the detection of a tank inlet failure, water leakage on the plant room floor or mains power failure.


MORE OPTIONS

Upgrade your Harton POD with an EC electromagnetic water conditioner or CAT 5 system.

Manufacturer Profile

Dutypoint Ltd

Engineering / Machinery

Click here

Share this page: